You can only gain access to certain items and special pricing if you have logged in. Login Now.

AM-04-43 Integrated Strategy for the Timely Production of Clean Fuel Products

John E. Price, CHS Inc.

Format:
Electronic (digital download/no shipping)

Associate Member, International Member, Petrochemical Member, Refining Member - $0.00
Government, NonMember - $25.00

Description:

This paper outlines the issues and conclusions that led CHS to undertake an integrated investment strategy, which entails the revamp of an existing Gas Oil Hydrotreater (GOHT) and the construction of a new distillate hydrotreater. The benefits achieved by this strategy are summarized in the paper. The paper also reviews the key steps of the process (from project scope development through design), the current operating results for the revamped GOHT and the status of the grassroots distillate hydrotreater. Hopefully, CHS’s experience will provide other refiners with new insights into preparing for future fuels regulations.

Product Details:

Product ID: AM-04-43
Publication Year: 2004