You can only gain access to certain items and special pricing if you have logged in. Login Now.

AM-11-37 Achieving On-Stream Reliability at Tesoro’s Mandan FCC Unit

Ray Wangler, Darren Johnson, Terry Staebell, Tesoro Refining and Marketing Company Mandan, ND; Warren Letzsch, John Hood, Shaw E&C

Format:
Electronic (digital download/no shipping)

Associate Member, International Member, Petrochemical Member, Refining Member - $0.00
Government, NonMember - $35.00

Description:

After purchasing Amoco’s refinery located in Mandan, North Dakota, Tesoro initiated a major revamp of the FCC unit. A new riser and external primary reactor cyclone was installed along with a lengthened stripper in a 33 day revamp turnaround. Large increases in gasoline yield obtained at the expense of slurry were seen after the modifications. The cat cracker completed a very profitable run with minimal problems and was brought down for a regularly scheduled maintenance turnaround. Some coke was found in the reaction system that is typical of resid FCC operations and minor refractory repairs were performed. Upon completion of the maintenance turnaround the unit was once again producing the same yield structure seen after the unit revamp. Another very successful run is anticipated.

Product Details:

Product ID: AM-11-37
Publication Year: 2011