You can only gain access to certain items and special pricing if you have logged in. Login Now.

PD-06-104 Multivariable Control without Step Testing, A Recent Implementation for BP in the UK

Roland Sims, APC Consultant, PAS, David Lawrence, Instrument Technical Authority, BP, Victor Rice, VP APC&O Business, PAS

Format:
Electronic (digital download/no shipping)

Associate Member, International Member, Petrochemical Member, Refining Member, Special/Temporary Member - $0.00
Government, NonMember - $25.00

Description:

The session will present how a multivariable control was installed at a BP facility in the UK. The goal of the project was to install a multivariable control while minimizing plant disturbance during implementation of the project. The process of implementation will be illustrated showing exactly what steps were taken to minimize plant disturbance. The BP CATS project will be presented where not only was step testing not required, but where the commissioning process went very smoothly.

Product Details:

Product ID: PD-06-104
Publication Year: 2006