You can only gain access to certain items and special pricing if you have logged in. Login Now.

RMC-05-108 Determining Risk Associated Inspection And Overhaul Of Turbomachinery: Yesterday, Today, And Tomorrow
Mike Drosjack, Senior Principal, Rotating Equipment, Shell Global Solutions (US), Inc., Charlie Rutan, Lyondell Chemical Company, And Murari Singh, Chief Engineer/Manager-Engineering Technology, GE Energy.
Format:
Electronic (digital download/no shipping)
Associate Member, International Member, Petrochemical Member, Refining Member, Special/Temporary Member - $0.00
Government, NonMember - $25.00
Description:
Machinery turnarounds involve significant cost to execute as well as a higher cost when done wrong. Proper planning requires an accurate determination of component remaining life and refurbishment and/or replacement potential. Tools are available to make predictions of risk versus time between inspection/overhaul based on FMEA-based tools and/or more sophisticated analyses. These will be discussed and demonstrated.
Product Details:
Product ID: | RMC-05-108 |
---|---|
Publication Year: | 2005 |