You can only gain access to certain items and special pricing if you have logged in. Login Now.

RMC-16-118 New Practical HTHA Prioritization Method for Inspection and Replacement and User Experience with this Method

Gerrit Buchheim Refining Metallurgical and Corrosion Expert & Pono Division Manager Becht Engineering Hihei, HI Jeremy Staats Refining Metallurgical and Corrosion Engineer Becht Engineering Lawson, MO Nick Pekula Reliability Engineer PBF Energy Paulsboro,

Format:
Electronic (digital download/no shipping)

Associate Member, International Member, Petrochemical Member, Refining Member - $0.00
Government, NonMember - $35.00

Description:

Two major items regarding HTHA in refineries and chemical plants are discussed. With the recent industry experiences with HTHA of CS and C-0.5Mo steels, the Becht Pono method considers many more practical factors influence life, such as age, stress, confidence in data, inspections performed, upsets, etc. and shifts Nelson curves and operating conditions plotted to help in prioritize inspections and replacements. The second topic is how PBF Energy used this method and the project feedback to help them make turnaround decisions and their perceived value.

Product Details:

Product ID: RMC-16-118
Publication Year: 2016